Welcome to your 2365 210 Communicating with others on site. This mock exam is not a substitute for proper teaching or revision and should only be used as a resource to prepare learners for the exam. The questions (along with the wording and diagrams) contained within the bank of this exam are purely made up by our lecturers and not copied from any actual qualification exam. So while this is an excellent free revision resource, please do not rely on these exam questions alone to help you be successful within your qualifications. When you are ready, please press "start quiz".
1.
Access to goods and services is covered under which of the following Acts?
2.
If a cable run measured on a drawing with a scale of 1:25 is 65cm, what is the actual length of the cable run?
3.
Which one of the following communication methods is considered as official and can help towards a good company image?
4.
On a set or plans for a domestic rewire, a rectangle is used as a symbol to denote a?
5.
A means of displaying work activities against time can be best accomplished by the use of a?
6.
Who would most likely install a solar thermal hot water collector?
7.
If there was a dispute between an employee and an employer, who could be used in the discussions?
8.
Lack of cooperation with other trades and contractors during an electrical installation could lead to?
9.
One item of information NOT illustrated on a bar chart work schedule is?
10.
One quality that would ensure the respect and cooperation of others on site is?
11.
Material delivered to site should be checked against the delivery note and the?
12.
What form of communication best ensures an instruction has been fully understood?
13.
The area of control relating to air conditioning systems is that of the:
14.
The main purpose of the manufacturers data is to provide installation information and?
15.
What is effective verbal communication based on?
16.
What engineer is most likely to install ducting in his work activities?
17.
Who should maintain a mains consumer unit?
18.
What type of engineer installs an air conditioning unit?
19.
Which of the following diagrams would you not use to work on a new installation?
20.
The first thing to be considered when planning a new installation is the?