Welcome to your Inspection and Testing. This mock exam is not a substitute for proper teaching or revision and should only be used as a resource to prepare learners for the exam. The questions (along with the wording and diagrams) contained within the bank of this exam are purely made up by our lecturers and not copied from any actual qualification exam. So while this is an excellent free revision resource, please do not rely on these exam questions alone to help you be successful within your qualifications. When you are ready, please press "start quiz".
1.
If upon inspection there is a socket with 30mA RCD protection and 2.9m from Zone 1 in a bathroom, what outcome would this be recorded as on an EICR?
2.
If upon inspection the label was missing on a bonding clamp, what outcome would this be recorded as on an EICR?
3.
Which one of the following reasons would require an Electrical Installation Condition Report
4.
When performing an initial insulation resistance test on a central heating circuit you should
5.
Why is it important to test a new installation in the correct sequence?
6.
A Residual Current device should be tested with
7.
Why is the Prospective Fault Current (Ipf) test carried out?
8.
An earth fault loop impedance test performed on a ring final circuit will record
9.
Where is the value obtained for the Earth Fault Loop Impedance (Zs) of a circuit recorded?
10.
Electrical equipment installed outside in caravan parks shall have a minimum IP rating, taking into account the presence of water and presence of foreign solid bodies, of
11.
What is the importance of verifying readings obtained with those listed within BS7671 and associated documents?
12.
An RCD test should indicate a reading in
13.
In a room containing a bath, electrical equipment installed in zone 0 shall have a degree of protection of at least
14.
Before recording the results of a continuity of protective conductors test under the R2 test you must ensure that?
15.
During the initial verification of several machines within a large and busy factory unit you run out of time to test the remaining ten before the night shift begins. What should be your course of action?
16.
Which document would be completed for an installation of a new shower circuit to an existing installation?
17.
The prospective fault current at the origin of an electrical installation must be taken into account when
18.
The rule of thumb method recommended by Guidance Note 3 for earth fault loop impedance is
19.
Why should we always check that the neutral conductor is dead when performing the safe isolation procedure on a lighting circuit?
20.
The earth lead of an earth fault loop impedance tester when recording the value of an earth electrode resistance should be connected to
21.
Guidance note 3 Inspection and Testing published by the IET is a?
22.
Which of the following would justify a C1 Code for a Periodic Inspection?
23.
The term Dutyholder used in the Electricity at work Regulations refers to the person
24.
The Health and Safety Executive publish a document for guidance on electrical equipment known as
25.
Which of the following does the Electrical Safety Council recommend as the best device for proving a circuit has been safely isolated
26.
What is the formula for calculating earth fault loop impedance?
27.
A public library has been refirbished and an additional lighting circuit is to be installed by your company. Upon Inspection the light fittings, you realise the light fittings do not comply with the minimum IP rating. What action should you take?
28.
An installation comprising 8 circuits have individual insulation resistance readings of 250 MΩ; 250 MΩ; 250MΩ; 250MΩ; 250MΩ; 250MΩ; 20MΩ; 2.2MΩ;. What is the total insulation resistance reading when they are all tested together as a whole?
29.
During one of the test methods for the continuity of CPC, GN3 recommends a temporary link should be made?
30.
An RCD protected socket outlet to BS 7288 should operate when tested at 1I within what time frame?