Welcome to your 2365 210 Communicating with others on site. This mock exam is not a substitute for proper teaching or revision and should only be used as a resource to prepare learners for the exam. The questions (along with the wording and diagrams) contained within the bank of this exam are purely made up by our lecturers and not copied from any actual qualification exam. So while this is an excellent free revision resource, please do not rely on these exam questions alone to help you be successful within your qualifications. When you are ready, please press "start quiz".
1.
Which document would outline the commissioning requirements for a piece of electrical equipment?
2.
Which of the following would not normally come under the umbrella of company policy and procedures?
3.
Which one of the following would NOT be required when compiling a specification for an installation?
4.
One item of information NOT illustrated on a bar chart work schedule is?
5.
Which of the following would you not find in an operations manual?
6.
An architect wishing particular design expertise would probably employ?
7.
What of the following is the term used to describe a situation where an employee resigns because an employer is bullying them?
8.
The route of main trunking within a property can be found in which document?
9.
Which one of the following communication methods is considered as official and can help towards a good company image?
10.
Probably the most efficient and fastest means of communicating technical information would be by?
11.
If a cable run measured on a drawing with a scale of 1:25 is 65cm, what is the actual length of the cable run?
12.
A room measures 4.25 metres long, what would it measure on a drawing scaled at 1:20?
13.
One quality that would ensure the respect and cooperation of others on site is?
14.
Lack of cooperation with other trades and contractors during an electrical installation could lead to?
15.
The prevention of disease is part of the responsibility of which of the following construction site visitors?
16.
Who would most likely install a solar thermal hot water collector?
17.
What is the process where people in a meeting discuss items and come to an agreement?
18.
What is an engineer who installs Pipe Push fittings into domestic/commercial premises is called?
19.
A nominated supplier might be selected by:
20.
What is the role of building services engineers?